David Sweeney
- Nov 27, 2019
Shower replacement
New shower tiles and tray gone in last week. Tricky job as the last one had been glued to the tiles which had to be replaced. Some rebuilding of the plasterboard wall was required. The plinth the tray was sat on had to be restructured and the waste water outlet pipes moved. The enclosure was then regrouted and resealed.


David Sweeney
- Nov 17, 2019
Engineered wood flooring
Installing an oak engineered wooden floor this week. Happy with the lines through the house and no thin slithers at the edges! This style is tongue and groove glued together with waterproof d4 woodglue. Underneath the floor I used a foil backed underlay on the floorboards. Made sure all the floorboards were nailed tight to stop the squeaks. The flooring was pre oiled but I will clean and oil it a couple more times. Makes it unwalkable for longer but a must if used in the kitc


David Sweeney
- Nov 7, 2019
Finished job
And here is the finished result. Nice even lines throughout. No thing slithers at the sides. Where the walls were uneven, the gaps were never more than 10mm and easily grouted or fitted with scotia/quadrant.


David Sweeney
- Nov 5, 2019
Laser accurate
Just setting out the laser for the floor tiling. Want to get a nice straight line through the house with no thin slithers either side. Results to follow....